1. The processing capacity of a single unit reaches 5000m ³/h! The foundation project of Dongjin Fertilizer cooling tower has entered a critical construction stage
Recently, the foundation projects of two large open cooling towers at Dongjin Fertilizer have officially started construction. As the core infrastructure to ensure the continuous and stable operation of the company's production system, the newly built two cooling towers have a designed processing capacity of up to 5000m ³/h. After completion, they will further strengthen the company's production guarantee system and provide key support for the stable release of production capacity in the future.
At present, engineering construction has entered a critical stage, with the core task focused on the construction of large-scale reinforced concrete foundations. This foundation adopts a pool type structural design, which has dual key functions of water storage and upper cooling tower support. Its structural stability directly determines the overall operational safety of the cooling tower. During the construction process, the project team strictly benchmarks the design specifications and safety standards, from material selection to process execution, making every effort to ensure that the foundation structure has excellent integrity, sufficient load-bearing strength, and reliable anti-seepage performance. Currently, the overall project is progressing smoothly and efficiently according to plan.
The construction of the cooling tower foundation project this time is an important measure for the company to promote equipment optimization and upgrade production support capabilities. The successful completion of this project will provide key guarantees for the stable installation and long-term safe operation of the cooling tower body in the future. The company's technical department will continue to strengthen quality control and safety supervision throughout the entire construction process, and make every effort to ensure high-quality and efficient completion of the project, injecting new momentum into the continuous and stable production and operation of the company.
2. Knlan New Fertilizer Branch Equipment Department breaks through the problem with forklift standard video to help the company comprehensively promote the construction of standardized operating procedures for positions
Recently, the Equipment Department of Knlan New Fertilizer Branch focused on the safety pain points of forklift operations, completed the video production of forklift process inspection and operation procedures, and promoted their use in the factory, providing intuitive and standardized practical guidance for forklift operators and maintenance personnel.
As the core equipment for material transportation in the factory area, the safe and stable operation of forklifts is directly related to the production efficiency and operational safety of the factory. Previously, due to some personnel's lack of solid understanding of the forklift inspection process and non-standard maintenance operations, there have been issues such as driving deviation and vehicle malfunctions. In response to this pain point, the Equipment Department of the Second Factory has solidified the standardized operation process in the form of videos, taking into account the high frequency and variety of forklift usage in the factory area. Through the presentation of "real-life demonstrations+subtitle annotations+voice explanations", it comprehensively covers key nodes in the entire process of forklift inspection before operation, operation during operation, and maintenance after operation, transforming abstract specification requirements into visual practical guidelines.
The exploration of the Equipment Department of the Second Factory is not an isolated action, but a concrete implementation of the group's safety center's coordinated promotion of the construction of the "standardized operating procedures for positions" system. Since the start of the standardization construction work for positions this year, the company has developed a promotion plan covering all branches and positions of the company, with "standardized videos" as the core carrier. At the same time, to ensure the effective implementation of standardized procedures, a closed-loop management mechanism of "learning practice examination" will be further established: standardized videos for each position will be uniformly included in the mandatory pre job training content for employees, helping new employees quickly grasp the key points of standardized operations. As of now, the first round of video production has been completed.
The deep value of standardized job operation procedures is continuously highlighted, from single point breakthroughs to comprehensive expansion. On the safety level, by solidifying standardized processes, we can effectively avoid safety risks caused by improper human operations and reduce the incidence of accidents; On the efficiency level, unified equipment operation and maintenance standards reduce downtime due to malfunctions, providing guarantees for continuous and stable production; At the personnel training level, visual video teaching materials significantly shorten the pre job training cycle for new employees and provide clear guidance for old employees to consolidate their skills; At the management level, the standardization of job positions promotes the transformation of company equipment management from "experience driven" to "standard driven", laying a solid foundation for creating a safe, efficient, standardized and orderly production environment.